S4 · quantitative skill
Computing a reorder point
Turn a demand rate, a lead time and a buffer into the single number that triggers a purchase order.
Prerequisites
The merchant's question: "At what stock level do I actually place the order for the green mug?"
The short answer: two pieces added together — the demand you expect to sell while the order is in transit, and the buffer you hold because that expectation is uncertain:
ROP = d̄ × L̄ + SS = 7.08 × 45 + 65 = 318.6 + 65 = 384 units (319 + 65 on rounded components)
384 is the inventory position at which the order is placed. Not the shelf count.
The inputs
| Symbol | Value | Source |
|---|---|---|
| d̄ | 7.08 units/day | mean sales on in-stock days — Measuring velocity |
| L̄ | 45 days | mean supplier lead time — Measuring lead time from your own deliveries |
| SS | 65 units | 1.65 × σ_LTD, from Sizing safety stock from variance |
That is the entire input list. Everything else in this lesson is about using it correctly.
The arithmetic
Lead-time demand. While the order is in transit you keep selling:
d̄ × L̄ = 7.08 × 45 = 318.6 units
Add the buffer. The buffer is not part of the lead-time expectation; it is the extra you carry because the expectation has spread around it:
SS = 1.65 × 39.58 = 65.3 → 65 units
Add them:
ROP = 318.6 + 65.3 = 383.9 → 384 units
What 384 means in days is worth internalising: 384 / 7.08 = 54.2 days of cover. The supplier takes 45. The 9.2-day gap between them is the buffer, expressed in the same units the buyer thinks in. A reorder point that works out to less cover than the lead time has no buffer in it at all.
Position, not on-hand
This is where reorder points fail in practice, not in arithmetic.
Inventory position = on hand + on order − backorders.
On-hand counts only what is on the shelf. Position counts what is yours, including the pallet already confirmed by the ceramics supplier. If you compare on-hand to 384, you will order the mug again every day the first order is in transit — six weeks of daily reorders, each one looking locally rational.
If you compare available (on hand − committed) to 384 but forget inbound, you do the same thing from the other direction: the position is overstated, the trigger fires late, and you run short with a signed purchase order in your inbox.
Set the field to position. In a Shopify stack this is not automatic — the storefront's "available" usually means on hand minus unfulfilled, and inbound is tracked separately in a purchase order object. Reconcile those two views before trusting any reorder point you compute here. See Shopify native mechanics for what the platform does and does not keep.
The mistake that costs 26 units
Most reorder-point arithmetic in the wild drops the lead-time variance term. It treats σ_LTD as if the lead time were fixed:
σ = σ_d × √L̄ = 3.5 × √45 = 3.5 × 6.708 = 23.48
SS = 1.65 × 23.48 = 38.7 → 39 units
ROP = 319 + 39 = 358 units
That is 26 units below the correct 384, and more importantly the underlying spread is understated by 41% — 23.48 against 39.58. A store running 358 will stock out on the mug at roughly twice the frequency it intended, and every one of those stockouts will look like a demand surprise rather than an arithmetic omission. On this SKU the omission is not a rounding issue: 65% of the variance is the supplier's timing.
Assumptions
1. Distribution of lead-time demand. The 384 is a quantile — the level at which the probability of running out during the lead time equals your chosen 5%. It is only that quantile if lead-time demand is normal. The mug's 45-day total is the sum of many small independent purchases, which is the case where the normal approximation is most defensible. A SKU with a few large wholesale drops in the mix has a right-skewed lead-time demand, and 384 protects less than 95% of it.
2. Stationarity / i.i.d. d̄ = 7.08 and σ_d = 3.5 are assumed to describe the next 45 days. Consecutive days are assumed independent. Both are false to some degree: the mug sells more in Q4, and a dark day suppresses the next day's recorded sales. Under a 2%-per-month ramp, the lead-time demand for the next 45 days is above 318.6 and the reorder point is late for the whole climb. Under promotional lumpiness, σ_d understates the real spread.
3. Demand–lead-time independence. The two terms are added, which assumes the supplier's timing is unrelated to how fast you are selling. If the same seasonal peak that drains the shelf also delays the kiln, the terms are positively correlated and 384 is too low precisely when it matters.
4. Review regime. 384 is a continuous-review reorder point: it assumes you observe position daily, so the exposure window is the lead time alone, 45 days. Checked every 12 days instead, the same service level requires 73 units of buffer and a reorder point of 319 + 73 = 392 units. Using 384 in a periodic system under-protects by 8 units — see Periodic versus continuous review.
5. Constraints ignored. The formula assumes any order quantity and any order timing are acceptable. A case pack that forces 288 or 312, an MOQ above 296, or a supplier shipping window that moves the effective lead time all shift the reorder point. None appear in the arithmetic; all appear in MOQs and pack integrity.
6. Observed sales treated as demand. d̄ = 7.08 is measured on in-stock days only, which is the right correction for the mean but not a correction for the spread: days that went dark are missing from σ_d, so σ_d = 3.5 understates true variability and 384 understates the required point. Censoring and the all-days denominator is the full treatment.
Where this breaks
When demand is trending or seasonal. A reorder point built on a twelve-month mean is wrong in every month. The fix is either a time-phased reorder point (recompute monthly) or a seasonal buffer, not a larger z.
When the lead time is a composite. If the supplier ships in two partials, or a consolidator holds the container, "45 days" is an average of stages with different variances, and the arrival date is not one random variable. The variance of a sum of stages is the sum of the stage variances — defensible — but the mean is the sum of stage means and drifts whenever any stage drifts.
When the item is intermittent. A SKU selling 0.3 units a day has many lead times with zero demand. The reorder point may compute below one unit, at which point the concept stops being meaningful and you are really making a keep-or-drop decision — see A policy for the long tail.
When the shelf count is wrong. Every stockout attributed to a low reorder point on a store with 620 SKUs deserves one check first: was the position actually 384, or did the system believe it was? Record accuracy as a discipline precedes all of this.
Blog version and what this adds
The discovery post gives the trigger formula; this lesson adds position vs on-hand and the σ_L-inclusive trigger. Blog version: /blogs/reorder-point-formula.