S3 · conceptual understanding

Periodic versus continuous review

Why checking stock every day and checking it every other Tuesday require different buffers, and when the extra stock is worth it.

The merchant's question: "Should I watch stock daily and order the moment the mug hits a line, or just run an order every second Tuesday?"

The short answer: either can work, but they are not the same system with a different schedule. Continuous review watches a trigger and protects you for the lead time. Periodic review watches a calendar and protects you for the lead time plus the gap until the next review, because between checks you can drop below your trigger and nobody notices. On the green mug that gap costs 8 units — 65 becomes 73, a 12.6% bigger buffer for identical demand and identical supplier.

Two different protection windows

Under continuous review you observe the inventory position constantly and place an order the moment it hits the reorder point. The only window of exposure is the lead time L̄ = 45 days.

Under periodic review you look every R = 12 days. Order on day 1, and you will not look again until day 13. If demand drains the shelf on day 3, you find out on day 13 and the order lands on day 13 + 45. The exposure window is therefore L̄ + R = 57 days, not 45.

Everything else follows from that difference. The buffer has to cover 57 days of uncertainty instead of 45:

SS_periodic = SS_continuous × √((L̄ + R) / L̄) = 65.3 × √(57/45) = 65.3 × 1.1255 = 73.5 → 73 units

Twelve percent more stock, for the same service level, caused only by the calendar.

What that means in practice

The difference is not only size. In a continuous system you order a fixed quantity — the EOQ, 296 units — every time the trigger fires, and the interval between orders floats with demand. In a periodic system you order a variable quantity: you top up to a target level, so quantity adapts and the interval is fixed at 12 days.

That inversion matters more than the 8 units. Fixed intervals are what make a business operable: one purchase order run, one freight consolidation, one conversation with the supplier, one afternoon of the owner's week. Marlow & Finch has an owner-operator and one ops lead. A system that says "place an order whenever any of 620 SKUs crosses its trigger" requires either software that watches continuously or a person who does nothing else. A system that says "review everything on the 1st and the 15th" requires a spreadsheet.

A concrete illustration

Two versions of the same store, same mug, same supplier.

Store A runs a daily stock report and orders 296 units the day the position hits 384. Exposure is 45 days. Buffer 65 units. Average inventory is 65 + 296/2 = 213 units, or $1,235 at $5.80 landed.

Store B reviews every 12 days and tops up to a target. Exposure is 57 days. Buffer 73 units. Because the order quantity is the demand consumed since the last review rather than a fixed 296, average cycle stock is roughly d̄ × R / 2 = 7.08 × 12 / 2 = 42 units, not 148. Average inventory is 73 + 42 = 115 units, or $667.

Store B holds more safety stock and far less cycle stock. Its total holding cost is 46% lower — 115 units at $1.28 is $147.20 a year against $272.64 for Store A — while its buffer grew by 8 units and its order quantity shrank by 254. A merchant who compares only the safety-stock line will conclude periodic review is more expensive and will be wrong about the holding line.

The catch is ordering cost, and it is bigger than the saving. Store B places an order every 12 days — 30 a year at $35, or $1,050. Store A places 5.4 at $190.05. Add holding: Store B totals $1,197.20, Store A $462.69. Periodic review as configured here is $734 a year worse, because a 12-day order quantity of roughly 85 units is far below the EOQ of 296 and the ordering cost swamps the holding saving. Periodic review is cheap in inventory and expensive in transactions unless the review period is long enough to make each order economically sized. That trade is the subject of Min-max versus order-up-to.

The named boundary: a copied reorder point

The most common failure in this area is not choosing the wrong regime. It is choosing one and implementing the other's number.

A reorder point of 384 is a continuous-review artefact. It is built on a 45-day exposure. Put it into a periodic system that checks fortnightly and the trigger fires at the right level but the buffer behind it was sized for a shorter window — you are systematically 8 units light and will read the resulting stockouts as demand spikes. The reverse error is quieter and more expensive: computing a periodic buffer of 73 and then using it as a fixed reorder point in a continuous system, which buys 8 units of protection you did not need and hides the fact that your review period is doing nothing.

Where this breaks

When demand is lumpy rather than daily. The √((L̄+R)/L̄) scaling assumes demand accumulates smoothly. A SKU that sells in occasional multi-unit bursts can cross the reorder point and be exhausted inside the review gap, and no buffer sized on a smooth average prevents it. Periodic review is structurally hostile to intermittent demand.

When the review period is imposed rather than chosen. A supplier who ships only on the 1st and 15th has set R for you. So does a consolidation service. The buffer then has to cover a window you did not pick, and reducing R is a When a second supplier is worth the premium or freight question, not an inventory one.

When a promotion lands between reviews. Both regimes protect against a variance, not an event. A 12-day review period and a 48-hour flash sale is a mismatch no safety stock fixes; that is How much to buy when you only get one shot territory.

When the extra precision is not real. The 12.6% figure carries a caveat worth stating plainly: the √((L̄+R)/L̄) scaling is exact only when the lead time is deterministic. Carrying σ_L explicitly, the protection-period spread is √(57 × 12.25 + 50.13 × 20.25) = √1,713.31 = 41.39 units, and 95% of that is 68.3 units — 68, not 73. The difference exists because adding the review period to the mean exposure does not add review-period variance to the supplier's timing; the scaling rule over-charges the lead-time term. On this SKU the conservative number is 73, and it is the one to use, but a merchant who has measured σ_L carefully should know that the rule of thumb is being generous by 5 units.

When service is promised per customer. Both regimes here are sized against a cycle service level. If the promise is a fill rate, the buffer is set from the loss function instead — see Fill rate from the loss function — and the regime difference shows up as a change in exposure, not as a change in z.