S4 · practical decision
Min-max versus order-up-to
How to choose the two numbers in a min-max pair so the gap between them is your order quantity rather than an accident.
Prerequisites
The merchant's question: "My stock app has a min and a max field on every SKU. What goes in them?"
The short answer: the min is a trigger and the max is a target, and the gap between them is your order quantity. If you set the two numbers independently, you have silently chosen a lot size you never analysed. On the green mug, min 384 with max 477 orders 93 units — a third of the economic quantity — and costs 75% more per year than ordering 296.
What the two fields actually mean
Both constructions are "when inventory position falls to the min, order up to the max." They differ in which of the two numbers carries the service level.
Min carries the service. You set min equal to the reorder point, so protection is sized for the lead time. Max is then min plus your order quantity. This imitates continuous review: a fixed trigger, a fixed lot.
Max carries the service. You set max equal to what you need to cover the review period plus the lead time, because you only look on a schedule. Min is then where the position normally sits when the review comes round. This imitates periodic review: a fixed target, a variable lot.
Mixing the two is the ordinary failure. Min copied from the continuous arithmetic (384) and max picked as "a bit above min" produces a system whose service level is right and whose economics are wrong — the most frustrating kind of wrong, because nothing looks broken.
The three constructions, priced
| Construction | min | max | Typical order | Protection |
|---|---|---|---|---|
| Service-first (continuous) | 384 | 680 | 296 units | 45 days |
| Target-first (periodic) | 392 | 477 | 85 units | 57 days |
| Independent numbers | 384 | 477 | 93 units | 45 days |
Service-first
min = ROP = 384 (from Computing a reorder point: 319 + 65) max = min + Q = 384 + 296 = 680
The band width is the order quantity, 296 units. Average inventory is 65 + 148 = 213 units, and annual ordering plus holding is 5.4 orders × $35 = $189.90 plus 148 units × $1.28 = $189.44, total $379.34 — the EOQ identity, where the two halves are equal by construction.
The consequence to accept: right after an order lands, position is 680 units, or 96 days of cover. That is not a mistake, it is what ROP + EOQ looks like. If 96 days of a bestseller makes you nervous, the problem is the EOQ, not the max.
Target-first
max = d̄(L̄ + R) + SS_periodic = 7.08 × 57 + 73.5 = 403.6 + 73.5 = 477 min = max − d̄ × R = 477 − 7.08 × 12 = 477 − 85 = 392
The band is 85 units — the demand consumed in one review period — so the system orders roughly every 12 days. Protection comes from the max: 477 units covers 57 days of exposure at 95%.
Note that 392 is not a reorder point. It is 55.4 days of cover, more than the lead time, and its job is to fire once per review cycle rather than to defend a service level. This is the construction that most closely matches how a calendar-driven review actually runs.
Independent numbers
min 384, max 477, order 93 units every ~13 days. Service level: correct, because the min is the reorder point. Economics: 1,606 / 93 = 17.3 orders a year at $35 = $604.41 ordering, plus 46.5 units of cycle stock at $1.28 = $59.52, total $663.93 — against $379.34. The 75% premium buys nothing; it is the tax on a band that nobody chose.
The cost is also operational. 17 orders a year on one SKU, repeated across a catalogue, is a purchase-order queue rather than a purchasing process.
How to decide
Step 1 — which regime are you actually running? If someone checks the stock report most weekdays, use service-first. If the review happens on the 1st and the 15th, use target-first. Do not mix, and do not choose based on which is easier to explain.
Step 2 — decide what the band width is for. It is either your economic lot (service-first: use the EOQ or a POQ lot from Lot sizing beyond EOQ) or your review drawdown (target-first: d̄ × R). Anything else is unplanned.
Step 3 — check the band against physical constraints. If the band is narrower than a case pack or an MOQ, the system will order a quantity that fails to clear the max, and the next check will trigger again. On a pack of 24, an 85-unit band means ordering 96 units and sitting above max — harmless — but a 20-unit band on the same pack means ordering 24, then 24 the next day, then 24 again. The band must be at least one pack and ideally several.
Worked decision
Situation. Marlow & Finch runs a Google Sheet and checks it most mornings. MUG-GRN-12 currently carries min 384 / max 477, set once in 2023 and never revisited.
Diagnosis. The min is right — it is the reorder point. The max is not derived from anything, and its only effect is to cap every order at 93 units. Seventeen orders a year, $663.93 in ordering and holding, versus 5.4 orders and $379.34.
Decision. Service-first. min stays at 384, max moves to 680. The store's exposure does not change: 384 still covers demand over the lead time plus a 95% buffer. What changes is that each order is now economically sized.
What to watch. 96 days of cover after each delivery will look like overstock to a merchant used to 13-day cycles. Two things make it tolerable: it is the arithmetic consequence of the EOQ, and the cycle stock turns — unlike the 65-unit buffer, which does not. If the owner cannot accept it, the honest response is to re-derive the order quantity from cash and shelf constraints, which is Allocating a finite cash budget across SKUs, rather than to shorten the band by guess.
Where this breaks
When the min is a screen rather than a computation. Many stores set min as "two weeks of sales" and max as "six weeks of sales." That is a days-of-cover policy, and it is coherent only if the numbers happen to satisfy the protection requirement. Check: min ≥ d̄L̄ + SS. On the mug, two weeks is 99 units against a requirement of 384 — an eightfold understatement that the round numbers conceal.
When the supplier imposes a ship window. A supplier who ships only on the 1st makes R = 30 by constraint, which forces the target-first construction whether or not you run daily checks. See inventory-replenishment-methods.
When inbound is invisible to the trigger. min-max compares position to the trigger. If the platform's max and min logic reads on-hand only, a single in-transit order puts the system into a reorder loop. Verify which field the tool reads before trusting either number — Shopify native mechanics.