S3 · practical decision

Buffer triage

An ordered procedure for a SKU that keeps going dark, starting with the lever that is cheapest and ending with buying more units.

The merchant's question: "The green mug keeps going dark and I'm tired of it. Where do I spend the next dollar?"

The short answer: almost never on more mugs, and almost never first. Six levers move the same buffer, and they are not equally expensive. On Marlow & Finch's mug, the buffer is 65 units and 65% of the variance driving it comes from the supplier's timing rather than from customers. A conversation about committed ship dates removes 16 of those units at zero carrying cost. Buying the same protection in stock costs real money and does nothing about the cause.

The six levers, priced

Start from the base case: σ_LTD = 39.58, buffer 65 units, $83.20 a year to hold. Each row is one lever pulled alone.

Lever Change σ_LTD Buffer Units saved
Base — 39.58 65 —
Shorten the lead time L̄ 45 → 30 days 37.18 62 3
Reduce lead-time variability σ_L 4.5 → 2.5 days 29.40 49 16
Do both L̄ 30, σ_L 2.5 26.09 43 22
Tighten the forecast σ_d 3.5 → 3.0 37.68 63 2
Pool two channels one buffer, not two 55.97 92 vs 131 38
Buy the units z 1.65 → 1.96 39.58 78 −13

Two rows should stop you. Shortening the lead time by 15 days saves 3 units. Reducing its variability by 2 days saves 16. The instinct to negotiate a faster supplier is buying the wrong thing — the buffer is driven by the square of the lead time's spread, not by the length of its mean. And cutting σ_d from 3.5 to 3.0 saves 2 units, because the demand term is only 35% of the variance. A merchant who spends a quarter improving forecasts on this SKU will move the buffer by 2 units.

The pooling row is structural rather than parametric — see Why pooling beats splitting. The last row is what most people do first.

Step 0: is the target right?

Before any of the above, check that 65 units is aimed at the right thing. If the owner's promise is "95% of mug orders ship from stock," that is a fill rate, and the buffer is 2 units — not 65. The single largest lever in this lesson is often not a lever at all but a mis-stated target, and it is worth 63 units on this SKU.

Run the check in Fill rate from the loss function. If the honest target is a cycle service level — one shortfall every twenty cycles — keep 65 and move on.

Step 1: decompose the variance

Split σ_LTD² into its two parts. On the mug:

  • Demand term: L̄σ_d² = 45 × 12.25 = 551.25 → 35.2% of the variance
  • Lead-time term: d̄²σ_L² = 50.13 × 20.25 = 1,015.06 → 64.8%

Then apply a threshold:

  • Lead-time share above 60% → the supplier is the problem. Go to step 2.
  • Demand share above 60% → forecasting, pooling, or demand shaping. Go to step 3.
  • Between 40% and 60% → both, and expect half-sized results from either.

The mug is at 64.8%, just over the line, and the conclusion is unambiguous: the buffer is a supplier story wearing a demand costume.

Step 2: mean or spread?

Within lead-time work there are two different fixes and they are not interchangeable, which is the subject of Safety lead time versus safety stock.

Is the lateness directional? Plot the last twenty deliveries against the promised date. If they cluster behind the promise — always late, by roughly the same amount — you have a mis-stated mean and the fix is to restate L̄ by a few days and hold a smaller buffer. Do not add units; you are buffering a certainty.

Is it scattered? If the deliveries fall either side of the promise with a spread, you have genuine variability and the fix is to reduce it. On the mug, σ_L = 4.5 against L̄ = 45 is a 10% coefficient of variation, which is high for a supplier with a fixed shipping schedule and low for one shipping when the kiln is full.

The practical ask is not "can you go faster." It is "can you confirm a ship date at order and hit it" — an administrative commitment, not a capacity one, and it moves σ_L without moving L̄. On the mug, taking σ_L to 2.5 is 16 units.

Step 3: buy the units, last

Only now, and buy them in the right units. Raising z from 1.65 to 1.96 (95% → 97.5% cycle) costs 13 units, $16.64 a year; going to 2.33 (99%) is 27 units, $34.56. The escalation is convex, which is why this lever belongs last.

Worked decision

Situation. MUG-GRN-12, bestseller, goes dark roughly twice a year, buffer 65 units, lead-time variance share 64.8%, lateness scattered rather than directional.

The sequence the triage produces:

  1. Target check. Owner confirms the promise is a fill rate — "orders ship from stock" — and 95% is the number. Buffer moves from 65 to 2 units. This is a decision, not a modelling subtlety, and it should be taken deliberately and recorded, not discovered later.
  2. Supplier ask. Regardless of the buffer number, ask for committed ship dates. σ_L 4.5 → 2.5 is worth 16 units of buffer headroom — the difference between a 95% fill target being comfortable and being a knife edge.
  3. Buy last. If 95% fill is unacceptable and the store wants 99%, that is 27 more units at $34.56 a year — a priced choice rather than a default.

The material point is not the 63 units. It is that the first two moves cost nothing in inventory and address the cause, while the third treats a symptom and is permanent.

Where this breaks

When you cannot measure the variance. The triage is a variance-decomposition procedure, and with three observed lead times there is no σ_L to decompose. Below roughly a dozen deliveries, the ranking above is noise; Measuring lead time from your own deliveries comes first.

When the lever costs more than the buffer. Worth doing the arithmetic, because on a single small SKU the numbers are tiny: the entire 65-unit buffer costs $83.20 a year. If a supplier asks for a 2% price increase — $0.116 a unit, $186 a year on 1,606 units — to guarantee dates, the inventory saving is $20.48 and the deal is bad on carrying cost alone. The reason to still do it is stockouts on a bestseller, which is a revenue argument, not an inventory one. Do not dress a revenue argument as an inventory saving.

When the stockout is a record problem. If the shelf was never actually empty and the system said it was, none of this applies. Check Record accuracy as a discipline before decomposing any variance; the most common cause of "it keeps going dark" on a store with 620 SKUs is that the position was wrong, not that the buffer was small.