Dependent demand and gross-to-net
Explodes bundle demand into component requirements, nets off stock and open orders, and shows why component forecasts must not be made independently.
Prerequisites
Going Forward
A gift set is three products sold as one. When someone buys it, the mug, the notebook and the pen all leave the building together — so how many of each should be ordered for a season of 120 sets? The naive answers are both wrong: ordering 120 of each ignores what is already on the shelf and already on order, and forecasting each component from its own sales history double-orders it, because the component's history already includes every set it was pulled into.
The arithmetic that gets this right is called gross-to-net, and it is the same calculation MRP systems have run since the 1970s. It is short enough to do on a sheet.
The structure
Three quantities, in order:
- Gross requirement — what the parent schedule demands, exploded through the bill of materials. For a parent with demand
Dandqunits of a component per parent, gross requirement isD × q. - Available — on hand plus scheduled receipts (open purchase orders with a firm date). Only count receipts with a date you believe; a PO the supplier has not confirmed is not availability.
- Net requirement — what must still be ordered:
net requirement = gross requirement − on hand − scheduled receipts
floored at zero, then rounded up to the supplier's lot size, pack multiple or minimum order quantity.
The floor and the rounding are where the money is. A negative net requirement is not a credit — it is excess, and it should be visible as excess rather than silently absorbed. A rounded-up net requirement creates inventory that will still be there next period, which is why the calculation is normally run period by period rather than once for the season.
The bill of materials for GIFT-SET-01
| Component | Quantity per gift set |
|---|---|
MUG-GRN-12 |
1 |
NB-A5-01 |
1 |
PEN-BLK-01 |
1 |
Demand for the season: 120 gift sets. The gross requirement for each component is therefore 120 units — the explosion is trivial here because every quantity per is one, which is exactly why bundles are a good place to learn the arithmetic before meeting a BOM with three levels.
Gross to net, with stock in the way
| Component | Gross | On hand | Scheduled receipts | Net | Lot rule | Order |
|---|---|---|---|---|---|---|
MUG-GRN-12 |
120 | 40 | 60 | 20 | 24-unit pack | 24 |
NB-A5-01 |
120 | 15 | 0 | 105 | 25-unit pack | 125 |
PEN-BLK-01 |
120 | 30 | 0 | 90 | 250 MOQ | 250 |
Read the rows, not just the answer.
The mug needs 20 more units after 40 on hand and a confirmed 60 arriving. The pack size is 24, so 24 are ordered and 4 units of excess carry into the next period. Note what this hides: the mug also sells on its own at about 7 units a day. Its true gross requirement is dependent demand from the gift sets plus independent demand from singles:
total requirement = 120 (bundles) + 1,606 (annual singles) = 1,726 units
Ordering the 24 without adding the singles requirement would starve the retail SKU for a month. The rule is that a component's gross requirement is always the sum of its dependent and independent demand — and the independent part is the only part that gets a forecast.
The notebook is short by 105 units, which rounds to five packs of 25. Nothing subtle.
The pen is where round-to-MOQ bites. The net requirement is 90, the supplier will not ship fewer than 250, so 250 are ordered and 160 units of excess are created by the supplier's terms rather than by demand. That excess is real: 160 pens at the landed cost is cash, and at a 22% carrying rate it costs the same as any other stock. Either the pen's MOQ is renegotiated, or the gift set's design changes to a component with a smaller minimum, or the excess is planned into the next period's requirement. Writing "250" in the order cell without recording the 160 is how a bundle turns into a dead-stock problem.
Time-phasing
One-shot netting is enough for a single production run. For a season, do it period by period, because the order has to be released before the need.
Gift-set demand by month: 40, 50, 30. The mug opens with 40 on hand and a 60-unit receipt due in month 1, and the supplier lead time is 45 days.
| Month | Requirement | Opening | Receipt | Closing | Net requirement |
|---|---|---|---|---|---|
| 1 | 40 | 40 | 60 | 60 | 0 |
| 2 | 50 | 60 | 0 | 10 | 0 |
| 3 | 30 | 10 | 0 | 0 | 20 |
The total net requirement is 20 either way — the same answer as the one-shot version, by coincidence of these numbers — but the release date is not the same thing at all. The 20 units are needed in month 3, and the lead time is 45 days, so the order must be placed in the middle of month 1. A planner working only from the seasonal total will place the order when the season is nearly over and will be short. This is what people mean by dependency: the component's order date is set by the parent's need date minus the component's lead time, not by the component's own reorder point.
Assumptions
- The BOM is complete and correct. Every component, every quantity per, no phantom or substitute items. A wrong quantity per propagates to every unit of the parent, and the error is invisible in the net requirement.
- The parent schedule is a forecast, not a firm order. Every unit of error in gift-set demand becomes an equal unit of error in each component. Dependency does not reduce uncertainty, it transmits it.
- No scrap or yield loss. Assembly that breaks or discards units needs a scrap allowance added to the gross requirement; without it, the shortage appears during the assembly run.
- Components are independently orderable. Each has its own supplier and lead time, with no shared capacity, allocation or single-supplier constraint that couples them.
- Fixed lot sizes and lead times. Pack sizes and MOQs are known and stable, and the lead time used for offsetting is the one the supplier actually achieves rather than the one on the quote.
- On-hand and scheduled-receipt records are accurate. Both numbers come straight out of the system, and a netting calculation on a wrong count is worse than no calculation, because it produces an authoritative-looking order.
Where this breaks
- BOM drift. A substitution made on the assembly bench — a different pen because the black ran out — is not in the bill of materials, so the system orders black forever while the shelf fills with blue.
- Variant-level bundles. A gift set offered in three colourways has three different BOMs. Exploding at the parent level and dividing the components across variants produces shortages on whichever variant sells first.
- Reverse explosion. Returned gift sets come back as one SKU but must be credited back as three components — or disassembled and counted. Without the reverse step, phantom shortages persist for months. See Grading returns and disposing of them.
- Kits assembled at pick time. If the "bundle" is only a storefront fiction and the components are picked individually, the sale already decrements them correctly and a manual explosion double-counts. Check which mechanism is live before doing the arithmetic.
- Multi-level products. A notebook with a printed cover has its own BOM. Netting one level at a time requires ordering the levels by their deepest point in the structure and offsetting cumulative lead times; doing it by hand across three levels is where errors multiply.