S5 · practical decision

When a second supplier is worth the premium

A test for dual sourcing that separates a real second failure mode from a second relationship, with the premium-per-unit decision rule worked on the ceramics supply.

Should I split this order between two suppliers? The instinct says yes, because two sources cannot both be late. That instinct is wrong twice: they can both be late, and even when they are independent, splitting the order does not reduce the safety stock you have to hold.

This lesson gives five tests. A candidate source has to pass all of them before the premium is defensible, and most candidates fail the first.

Test 1 — independence

Do the two sources fail for the same reason? If both ship through the same port, buy the same raw material from the same mill, sit in the same industrial cluster, or staff up for the same holiday peak, then a bad month hits both. You have bought a second relationship, not a second supply.

This is where almost every nominal second source dies. A domestic decorator who buys the same imported mug blank as your overseas supplier is not an alternative to the import; it is a shorter-lead-time reseller of the same failure. It still has value — see test 3 — but the value is time, not independence.

The arithmetic of the tail is the reason this test comes first. If each source independently runs longer than 45 + 2σ_L with probability 0.023, then two independent sources both do so with probability 0.023² ≈ 0.0005. That is the benefit dual sourcing genuinely delivers, and it evaporates the moment the failures are correlated.

Test 2 — does the split reduce variance? Usually not

Take the standard safety-stock model and split demand fraction p to source A and 1 − p to B, each with the same L̄ and σ_L. Each stream must cover its own share, so:

  • safety stock for A = z × p × σ_LTD
  • safety stock for B = z × (1 − p) × σ_LTD
  • total = z × σ_LTD × (p + 1 − p) = z × σ_LTD

Identical to a single source. On the running example that is 65 units whether you buy all 296 mugs from one supplier or 148 from each. Splitting changes who you are exposed to; it does not change how much buffer the normal approximation asks for. Anyone who tells you a 50/50 split halves your lead-time risk is quoting the tail argument (test 1) while pretending it is a variance argument.

One thing does improve: if the two streams feed a single pooled position and you take whichever arrives first, the chance that both are late stops mattering for the buffer — but only if the order can be split across arrival dates without losing the quantity discount, and only if receiving can add stock mid-cycle. And if each stream has to be independently sufficient — different packaging, minimum presentation per channel — you now hold two safety stocks and total inventory rises at unchanged service. Count both buffers before committing.

Test 3 — the premium rule

Now the money. Worked on MUG-GRN-12:

Ceramics (base) Domestic decorator
Landed cost $5.80 $8.10
Lead time 45 days, σ_L 4.5 9 days, σ_L 1.2
MOQ 300 units 60 units
Capacity full volume ~400 units a year (25%)
Unit margin at $14.00 retail $8.20 $5.90

The second source costs $2.30 more per unit, or 28% of the $8.20 unit margin. That premium is a per-unit insurance payment against being unable to ship that unit. It pays only if the probability of otherwise being short on that unit exceeds 28%.

What is that probability? At a 95% cycle service level, a single cycle is short 5% of the time; over 5.43 cycles a year (D/Q = 1,606/296) the chance of at least one short cycle is 1 − 0.95^5.43 ≈ 24%. So on this SKU the premium is roughly at break-even against the chance of any shortfall at all — and it is clearly worse than break-even against the chance of a shortfall large enough to matter, because the expected shortfall per cycle is only 0.83 units (σ_LTD 39.58 × the loss function value 0.0209 at z = 1.65, as set out in loss function and fill rate).

Put plainly: the expected-value maths does not justify dual sourcing here, and pretending it does is how merchants buy insurance they cannot afford and skip insurance they need. The honest case for the domestic decorator is capacity and calendar — it can deliver 300 units inside a peak window that the 45-day pipeline has already missed, and 300 units arriving in week 48 is worth more than 300 units arriving in week 52.

Test 4 — minimum viable share

A share must clear the supplier's MOQ and be large enough that the order cadence is sane. The decorator's MOQ of 60 units is 3.7% of annual demand — feasible. But an MOQ of 300 against a 25% share of 1,606 units would be 401 units, meaning one order a year: a single annual arrival is not a second source, it is a second copy of the same lumpy risk. The test: share × annual demand ≥ MOQ, and order frequency ≥ twice a year.

The worked decision

Qualify the domestic decorator, but only for the peak window: 300 units booked in August for October delivery, at the $8.10 premium, held against Q4. Do not run a permanent 75/25 split — it buys no variance reduction, the decorator's capacity cannot survive a standing share without displacing their other work, and their blank comes from the same import pipeline, so a blank shortage fails both. Before booking, ask for the decorator's blank stock depth in units and the date it was last replenished. That number, not the 9-day lead time, is what you are actually buying.

Where this breaks

Splitting a scarce allocation is not dual sourcing. When supply is rationed, a second supplier who is also rationed just splits the same shortfall and you have added a qualification cost. The tests above assume each source can choose to serve you; in a genuine shortage none can.

The buffer arithmetic assumes one pooled demand stream and stationary lead times. Both are approximations: demand spikes during a supplier's own peak violate demand–lead-time independence and make the normal buffer understate the tail. And a second source producing a visibly different product — different glaze, different weight — is not a substitute SKU; treating it as one creates a returns and listing problem that belong to record accuracy, not here.

Assumptions

  • The two sources are alternatives for the same SKU with the same customer-visible outcome; when they are not, the decision is assortment, not sourcing.
  • Lead times are independently distributed within each source and independent between sources. The independence test exists because the second half of that is usually false.
  • Demand is stationary at d̄ = 7.08 units a day and independent of lead time.
  • The comparison uses the normal approximation with z = 1.65 for 95% cycle service, and ignores the estimation error in σ_L documented in lead-time measurement — which matters here, since a new source's σ_L is unknown until it has delivered several times.
  • Prices, capacity, MOQs and the $14.00 retail price are illustrative for this merchant. Fixed qualification costs — samples, a test order, the hours — are excluded, which biases the comparison towards dual sourcing.

Blog version and what this adds

The discovery post covers the qualitative case for a second source; this lesson prices the premium against the probability of a short cycle. Blog version: /blogs/dual-sourcing.