ClearStock by InventoryX is live on the Shopify App Store.Install free →

Install ClearStock
English
  • English
Browse Resources

S7 · practical decision

Buying a product with no sales history

Sizes a first buy from an analogue's distribution, a stated haircut, and a kill criterion fixed before the purchase order.

The purchase order for a new SKU is due on Friday and there is nothing to forecast. Every quantity on the table is either a supplier minimum or a number someone said out loud in a meeting. The decision still has a right shape, and it does not begin with a forecast.

Three moves do most of the work: borrow a distribution rather than a number from the closest analogue you have, size the bet so that being wrong is survivable and measurable, and write the exit criterion before the order goes out. The forecast is the smallest part of it.

1. Choose the analogue on attributes, not on category

An analogue is a SKU whose demand was driven by the same things that will drive this one: price band, use occasion, season, channel, and the customer who buys it. Category alone is not enough — a $14 notebook and a $62 hoodie share a shop, not a demand curve.

Pick two or three candidates and write down, for each, why it is comparable and where it differs. Then adjust the mean explicitly and leave the spread alone:

  • Adjustments that are defensible: a different colourway of the same silhouette (small effect on units, large effect on which variant sells); a price point 10–15% higher (units down, magnitude genuinely uncertain); a shorter selling window (units roughly proportional to weeks on the floor).
  • Adjustments that are not defensible without evidence: "this one will go viral", "the buyer loved it at the trade show", "the last launch did well so this will too".

Carry the analogue's coefficient of variation across as the uncertainty. HOODIE-NAVY sold 180 and 240 — a mean of 210 and a spread of about 42, roughly 20% of the mean. A new colourway inherits at least that spread, and usually more, because a launch has no repeat buyers, no reviews and no position in the merchandising calendar. Treating a new SKU as no more variable than a mature one is the most common error in a first buy.

2. Size the bet to the direction of the risk

The right haircut on the analogue's mean depends on which mistake is cheaper — the same ratio that governs How much to buy when you only get one shot, applied as a rule of thumb rather than a computation:

Situation Haircut on analogue mean Why
Margin per unit clearly exceeds clearance loss (Cu > Co) 0.85–0.95 Missing a launch sale is expensive; a small residual is cheap to clear
Clearance loss clearly exceeds margin (Cu < Co) 0.60–0.70 Residual units are the expensive error; the sale you lose is cheaper
Genuine salvage uncertainty (no clearance channel, consignment, dated stock) 0.50–0.60 Co is effectively the full landed cost

The haircut is not only about the cost ratio. It buys information: the first buy's job is to produce a sell-through signal you can act on, not to capture every unit of demand the SKU might have. A buy that is 15% too small teaches you the run rate by week three and costs you margin on a handful of units. A buy that is 40% too large teaches you nothing until the markdown, months later, when the cash is already gone.

3. Fix the read date and the kill line before the order

Write these into the purchase order notes, not into a plan you will revise:

  • Read date. The date at which you will judge the SKU: for a seasonal launch, week 4 of a 16-week season; for a core launch, day 45.
  • Kill line. The sell-through below which you do not reorder and begin marking down. For a first buy of an unproven SKU, a workable line is 35% sold at full price by the read date. Below it, the run rate implies the buy will not clear in the window.
  • Scale line. The sell-through above which you place a second order and accept the lead-time risk: roughly 60% sold by the read date, against a supplier lead time shorter than the remaining window.
  • Exposure cap. The most cash a single unproven SKU may consume, set as a share of the season's at-cost budget. Marlow & Finch's owner sets this at 5% per unproven SKU — a merchant decision, not an industry number — which caps one bad bet at a rounding error on the season.

Worked decision

HOODIE-RUST is a new colourway of the same hoodie body. Analogues: HOODIE-NAVY (180, then 240; mean 210) and one prior colourway that sold 156 in a shortened window of 12 weeks against a normal 16.

Starting quantity: the navy analogue, adjusted for the shorter comparison window — 210 × 16/16 = 210. Apply the haircut. Cost $26, full price $44, margin $18; clearance at $17 loses $9. Since Cu > Co, the table says 0.85–0.95; pick 0.90 for a first production run of a colour nobody has seen.

210 × 0.90 = 189 units

Pack constraint: the supplier ships in 12-unit prepacks across the size curve, so the feasible quantities are 180 or 192. Take 180 — the conservative side of an already-adjusted estimate, and 15 cases.

cash committed = 180 × $26 = $4,680
sell-through to break even on cash = 4,680 / (180 × $44) = 59%

That last line is the number the merchant should look at hardest. It says two things at once: the buy needs 59% sell-through at full price just to return the cash, and everything after that is margin. It also sets the kill line honestly — at the week-4 read, 35% sold implies a run rate of roughly 63% by season end, which clears the cash but not much more. Anything below 25% at week 4 is a markdown candidate, not a reorder candidate.

Where this breaks

  • No true analogue. A genuinely new category — a different use occasion, a different customer — has no borrowable distribution. The correct move is to convert the uncertainty into a different instrument: a preorder or backorder campaign, a small made-to-order run, or a consignment arrangement where unsold stock is not your cash. Ordering a large first buy on a category guess is not a forecast, it is a preference.
  • The analogue was supply-constrained. If the prior colourway sold out in week 5, its 180 units are a ceiling, not a demand observation. The same correction applies as for censored history anywhere else in this library.
  • Cannibalisation. A new colourway takes units from the existing one. Total demand is not additive, and a launch read on gross units will overstate the win. Compare the family's total, not the new SKU's.
  • A test buy too small to read. Under about 60 units, week-4 sell-through is dominated by whether one influencer posted. The signal is noise and the kill line will fire on randomness.
  • Kill lines that get renegotiated. The criterion is only worth writing down if it survives the week in which the SKU is not selling and everyone wants to give it one more month. Pre-commitment is the mechanism; without it the rest of this lesson is arithmetic theatre.