16-22 week lead times and one human babysitting 400 line items

ruth_tPosted

i'm the buyer at a small bike shop and fabricator in southern Ontario. we build cargo racks, custom frames and a few touring accessories, sell direct and through about 25 shops. around $300k a year, which sounds small until you see the parts list.

most of our tubing, hardware and odd fittings come from taiwan and mainland china, 16-22 weeks door to door. we run a cloud erp with an mrp module. if everything were 8 weeks or less i could let it hand me a daily action list. at 20 weeks there's too much room for a person to forget something.

our workshop manager has admitted it himself — a big shipment landing gives a false sense of security, then he doesn't look at that bin again for a month, sometimes until it's too late. we're build-to-order, and consumption on a lot of parts is erratic. two months well under average, then three orders at once. to fully automate it we'd need enormous safety stock, which we can't fund or store. is there a real strategy beyond staring at the same 400 line items every month?

18 replies

  1. c_moore

    the real options are carry more safety stock to cover lead-time variance, get a better forecast (needs solid input from sales and that's hard), or quote longer lead times to your customers. the third is usually last resort, but with everything this disrupted you might get away with it. we refuse because service is our differentiator. our suppliers pushed out, so we're carrying more ss and working on the forecast.

  2. twoweeks_77

    @c_moore

    one more — cut the number of parts. maybe three products use the same tubing in three gauges and one would do for all three. takes work and teamwork and you might find nothing, but worth a look.

  3. ruth_tOP

    @c_moore

    we have to keep customer lead times short to stay competitive. we actually took business off a competitor because they were at 24 weeks on a rack line and we could do 12. and i've been told flat out that forecasting is impossible here because demand is too random.

  4. c_moore

    @ruth_t

    what's the product? nine times out of ten it's the same excuse and it only really holds one time in nine.

  5. ruth_tOP

    @c_moore

    cargo racks and custom frames for shops. not quite utility transmission, but same problem — a shop orders six racks for a fleet customer and then nothing for two months.

  6. c_moore

    @ruth_t

    that's one i don't know well. buying more often might help — negotiate lower moq, maybe they'll hold a little stock for you. otherwise focus the forecast effort on the high-dollar parts, talk to the top shops' buyers, cut ss there and put the capital into the cheap volatile bits. good luck, these lead times have everyone stuck.

  7. ruth_tOP

    @c_moore

    i've been imagining a more predictive planned order calc out 6-9 months for the asian parts, sorted green/yellow/red so i can ignore green. too bad i'm not a software engineer.

  8. c_moore

    @ruth_t

    you can probably build it in excel. current on hand minus allocated, projected demand decrementing weekly, inbound pos adding, and you get a projected weekly stock level. when it drops below ss, that's your arrival date, count back the lead time for the order date. extend it as far as you want.

  9. ruth_tOP

    @c_moore

    good idea. i just need to work out the erp export. the api is apparently "available on request", which is its own warning.

  10. raj_supply

    @ruth_t

    i'm in the same industry and understand where you're coming from. everything at the end customer is project driven and they don't have good planning discipline. those aren't bad lead times for what we're seeing right now.

  11. claire_b

    build-to-order is something you really can't forecast. all you can do is double check quantities, because people forget lead time. everyone still thinks air freight is a week and sea freight is four.

  12. ledgerline_99

    @claire_b

    this. we air-freighted a $9 part last month because someone assumed the sea shipment was already on the water. it wasn't. the freight cost more than the part and the customer still waited.

  13. bluecrate

    in a job shop i'd work from build quantities. you know what you build, you have the boms. pick a quantity to keep on the shelf based on space, expiry and cash, and agree it with sales. without a forecast from sales you're just waiting to fail.

  14. yusuf_91

    how many of the 400 are actually doing the work? if 20 parts are most of the spend, maybe you only watch those monthly and let the rest run on min/max.

  15. ruth_tOP

    @yusuf_91

    that's probably the honest answer. i've been treating them all as equally scary. i'd guess 25 parts are 70% of the spend but i've never sorted it.

  16. nina_shop

    can you postpone the variant? hold plain tubing and cut/drill/powdercoat later. the more you finish before you know the order, the more skus you're forecasting. we moved two product lines to a cut-to-order model and halved the part count.

  17. ruth_tOP

    @nina_shop

    we do some of that already with the racks, but the frames are painted to order and the lead time is in the paint. maybe the answer is holding more unpainted and fewer finished colours. that's a workshop argument, not a spreadsheet one.

  18. priya_75

    @ruth_t

    it usually is. but it's cheaper than a container of the wrong colour.