their safety stock comes out in days. i need it in pairs of gloves
we make and sell leather goods, mostly gloves, some bags and belts. two shops and a website, central scotland, turnover around £910k. a consultancy spent four months rebuilding our replenishment and handed back a safety stock figure expressed in days. which is no use to my buyer, because the tannery sells in pairs.
their formula, roughly: service factor times the square root of forecast error squared plus supplier lateness squared, times lead time in days. our inputs are 95% service, so 1.65; forecast error 18% over the last twelve months; supplier lateness 11%; tannery lead 41 days. that lands at about 14 days of safety stock. at 26 pairs a day, roughly 370 pairs.
the version i know from a course works in units. expected demand over the review plus lead period, plus the service factor times the standard deviation of demand over that same window. when i run it monthly i get somewhere near 400 pairs of safety stock. close, never equal, and i can't explain the difference to the person who signs the purchase orders.
i can see theirs is basically an (r,s) model wearing a coat. what i want is to convert days into pairs properly and work out whether the gap is the averaging or the error term. has anyone done the translation
17 replies
noor_retail what are you actually trying to solve, though. i spent years at one of those firms and i did the course your screenshots come from. the thing nobody tells you is that supply chain is where theory has to survive a warehouse.
we'd do a transformation, pilot it, validate the tool, hand it over. then someone disagrees with a setting, changes it, the thing stops working, and the story becomes "the consultants broke it". the business rules end up simpler than the academic version because people are picking between four options, not sliding along a curve.
alex_53OP @noor_retail
i'm not trying to prove them wrong. i want to understand it and get to units so i can sanity check against the textbook. and credit where it's due, the tool is better than what we had. before this, replenishment was a planner's memory and whoever they got on with at the tannery.
noor_retail @noor_retail
then it's the easy bit. days of cover times average pairs per day gives you pairs. write it as fractions and the days cancel. the hard question is which average. mean, median, smoothed, same week last year. that's where your two numbers will keep disagreeing.
alex_53OP @noor_retail
so the formula isn't the problem, the average is. that explains why we're always within 10% and never equal.
cornerstore you're overcomplicating this. 14 days and 400 pairs are close enough that nobody outside your office can tell the difference. take the higher one, write down why, revisit after christmas.
alex_53OP @cornerstore
normally i'd agree. but the board has started asking what the safety stock is worth in cash, and "about 400 pairs, or maybe 370" is not an answer i can give twice.
cornerstore @cornerstore
then give them a range and a date you'll know more. they don't want the model, they want to stop thinking about it.
wes_75 the part that bothers me is treating forecast error and supplier lateness as independent. they aren't. the tannery that delivers late also delivers short, and the short delivery changes the error you're measuring next month. fine for a sanity check, not fine if you're setting the number people buy against.
alex_53OP @wes_75
hadn't considered that. it would explain why our october was so far off.
slowboat a mean absolute percentage error is not a standard deviation. if they've deliberately used mape as a stand-in for sigma, fine, but ask them to say so in writing. if someone just swapped the letters because the spreadsheet had a column called error, you're building a policy on a typo.
alex_53OP @slowboat
adding that to the list for the handover meeting. thank you.
paperlane_26 why is everything at 95%? gloves come in six colours and four sizes and half of them are fashion lines that die in eight weeks. a flat service level is paying to protect the stuff nobody wants. split it: 97% on black and brown, 90% on the seasonal colours, whatever on the one pair in lime.
alex_53OP @paperlane_26
we did try that on the shop side but the consultancy model has one service level per item class, and the classes are "glove", "bag", "belt". not exactly granular.
northwind is the course the mitx one in supply chain? been eyeing it. i'm on the transport side and want to widen out a bit.
noor_retail @northwind
no, i did the full campus masters in logistics before they renamed it. the online one is decent from what colleagues say, but it won't teach you the politics of a handover.
zoe_84 screenshot the sheet with the actual numbers if you can. someone here will recognise the template in about four minutes and tell you whether it was annualised or not.
josh_99 late to this but i rebuilt one of these last year. the conversion everyone forgets is that days of safety stock has to be days of average demand, not days of current demand. if you're using the same week last year for a seasonal line, your 14 days is 14 days of a different month. that's probably your missing 30 pairs right there.