'it'll sync with your stock system' cost us five months and fourteen grand

sofia_stockPosted

we make and sell shoe care. polishes, wax, brushes, laces, the cedar shoe trees. one shop in falkirk, the rest online, just under 480k last year, four of us including me.

we wanted the reorder loop automated. right now somebody walks the shelf, notices we're low on black wax, types a po into the stock app. i hired a two person dev shop to build it properly. when a line drops under its minimum, raise a draft po to the default supplier and push it through to the accounts package.

what we got was an app that only talks to itself. it has its own idea of a product record and its own quantity format, and it won't write to the stock system in anything that system recognises. every sync either drops the line or doubles it. i've spent most of the last five months matching endpoints by hand. escalated to them, got a "we'll look into it", then nothing.

tried a middleware layer myself. that just gave us one more thing to babysit. asked the stock system provider if we could bend their schema, no, it's locked and they won't entertain changes for a shop our size.

so. if a vendor integration has fallen over on you before, what clauses do you wish you'd written? i'm about to hold their final invoice and i'd rather do it with a document than with a feeling.

17 replies

  1. leah_store

    the usual failure is that "integrates with the stock system" was written as a vibe rather than something you can test. a spec needs the exact format that system wants for each field, the sync frequency, and what happens on a mismatch. reject and alert, or try a partial match. without that, any contractor can say they comply and hand you something that technically connects and then collapses on real data. worth an acceptance clause on real historical products before the last payment, not a demo with clean test data.

  2. ben_f

    put versioned field mapping and a set of sample payloads in the spec. identifiers, status changes, required fields, error responses. require idempotent updates, retry handling and a reconciliation report, then make them prove the whole flow on anonymised real pos before sign-off. also pin down who pays for fixes when either side changes, and how failed syncs get logged.

    do they expose a documented api, or are you getting proprietary files?

  3. sofia_stockOP

    @ben_f

    documented. on paper. what arrives doesn't match the paper.

  4. twoweeks_49

    a strict schema validation clause tied to milestone acceptance. payment held until payloads pass automated tests, idempotency keys on every sync so a retry doesn't duplicate a po, and automated tests against a staging copy of your stock system before anything touches live.

  5. tinroof_40

    every comment in this thread is a bot. i see them everywhere now.

  6. mike_warehouse

    the lock is your real obstacle. no clause makes their payload fit a schema nobody is allowed to change. they conform to yours, not the other way round. everything else is a conversation about who eats the cost of them rebuilding.

  7. sofia_stockOP

    @mike_warehouse

    that's where i've ended up. they built to their shape and assumed we'd move.

  8. marc_26

    stop patching and hold the last milestone until they pass on real payloads. otherwise you're maintaining their format forever, and you're a four person shoe polish company, not a systems integrator.

  9. twoweeks_49

    @marc_26

    agree with the hold. and put the acceptance test in writing before you release anything, even now. "passes on 50 real products including the two pack sizes" is a sentence they can't argue with.

  10. nadia_31

    @marc_26

    fourteen grand on a 480k turnover is the bit that would keep me up, not the integration. you could have paid a student to raise the pos by hand for two years and still had change. sometimes automation is a hobby with an invoice.

  11. sofia_stockOP

    @nadia_31

    ha. yes. in my defence the quote was eight and it was supposed to take six weeks.

  12. rob_planning

    genuinely asking, why not just use the low stock alert that's already in the stock app? most of them do reorder points now.

  13. tomasz_retail

    @rob_planning

    because the built-in one reorders in singles from one default supplier. we have two wax suppliers and one sells slabs while the other sells cases, and the alert can't hold a pack size. that's the whole reason we went custom. should have checked that before signing, i know.

  14. rob_planning

    @tomasz_retail

    ah right. yeah that's a different problem. shame the app people couldn't just add pack sizes, it's not exactly exotic.

  15. sofia_stockOP

    one thing i should probably admit. i don't actually know what format their output is in. i know it isn't ours. i've been comparing what lands in the stock app against what's on the po and working backwards. that's most of why this has taken five months.

  16. shelfside

    coming back to this after the weekend. did you hold the invoice? because if you've paid it, you've got no leverage and the "we'll look into it" becomes permanent.

  17. sofia_stockOP

    @shelfside

    not paid. 3.5k left on it. the awkward part is they still have the source code and i don't.